05-4565A01, Rev. A
MDS entraNET Start-Up Guide
7
Invisible
place
holder
Figure 3. DIN Rail Mounting Details for MDS Equipment
Step 2—Install the Antenna
To minimize radio frequency interference, the antenna should be
mounted at least nine inches (> 23 cm) from the connected device(s),
sensors and other components of the system.
Step 3—Measure & Connect DC Power
The power applied to transceivers (AP and Remotes) must be within
6–30 Vdc and be capable of continuously providing a minimum of 11
Watts. (Typical power consumption is 800 mA at 13.8 Vdc for the AP
and 600 mA at 13.8 Vdc for Remotes.)
A power connector with screw terminals is provided with each radio.
Strip the wire leads to 6 mm (0.25"). Be sure to observe proper
polarity, as shown in
Figure 4
, with the positive lead (
+
) on the left.
NOTE:
It takes approximately 30 seconds for the AP transceiver to
power up and be ready for operation. The Remote requires
approximately five seconds to power up.
Step 1: Attach the bracket using
the two screws provided. (Attach
to the end opposite the connectors.)
Step 2: Snap the assembly onto
the DIN rail. To remove the radio,
pull down on the release tab.
Summary of Contents for MDS entraNET Series
Page 31: ...Installation Guide...