7
7-2
User manual IC220SDL953 - September 2011
GFK-2731
When connecting the supply voltages, use the diagnostic and status indicators to check
whether the module has started up correctly or whether any errors are indicated. For
instructions on how to proceed in the event of an error, please refer to "Errors: Messages
Once the operating voltage has been applied:
–
If possible, measure the wave form of the voltages to
ensure that there are no deviations.
–
Measure the output voltages on the module, as well as
the supply voltages, which supply the connected loads
(e.g., motor) to ensure that they are in the permissible
range.
–
Use the LEDs on the devices to check that the module
starts up without any errors (there must be no red LEDs
permanently on; the FS LED flashes because the
device is not parameterized).
Check the assembly and installation.
Checklist "Assembly, removal, and electrical installation" on
Implement data flow between the standard controller and
the safety modules and between the safety modules
themselves.
"Implementation of data flow between the standard
controller and the safety modules" on page A-22
Download the parameterization and configuration data from
the standard controller to the safety modules.
"Downloading the configuration and parameter data record
following power up" on page A-27
Perform a function test and validation. Check whether the
safety function responds as planned during configuration
and parameterization.
Checklist "Validation" on page B-11
Table 7-2
Steps for startup (continued)
Step
Relevant section and literature