
B
GFK-2731
Chapter B
B-3
No. Requirement (optional)
Yes No Remark
16
Are all measures that are based on applicable standards planned?
17
Have the VersaPoint specifications (e.g., cabling, power supply) been
observed?
18
Have the accessories to be used been planned (e.g., cables, connectors)?
19
Is the transmission speed for the individual VersaPoint stations specified?
20
Are the specifications for parameterization, assembly, electrical installation,
startup, and validation of the IC220SDL953 described?
21
Are the specifications for parameterization, assembly, electrical installation,
startup, and validation of the satellites described?
22
Is the assignment of responsibility specified (e.g., for assembly/installation/
configuration, parameterization/startup/validation, etc.)?
Name/company:
23
Are measures planned which prevent hazardous states in each phase
(e.g., specification of individual steps in the procedure for each phase)?
24
Is monitoring of the actuators and sensors controlled/requested by the
VersaSafe system planned (e.g., reading of outputs)?
Date
Signature (author)
Date
Signature (test engineer)