139
•
Over Pickup for Over KW, Over Current, and Over Vunbal.
•
Time On for Over KW, Over Current, and Over Vunbal.
•
Time Off for Over KW, Over Current, and Over Vunbal.
The Setup 2 tab also provides push buttons for performing the following commands:
Download–
Executes a script to check for values that have changed and downloads
those values to the device via the GE 7700 Gateway.
Refresh–
.Executes a script to upload all of the meter values for the settings on the
screen.
Note
: Be sure to click the Refresh button prior to changing or downloading any
settings to the EPM7500 or EPM7600, as the latest settings may not be displayed.
Summary of Contents for EPM 7300
Page 8: ......
Page 15: ...7 Enter the name of the window to open when the icon is clicked on during runtime ...
Page 59: ...51 ...
Page 61: ...53 ...
Page 74: ...66 PMCS Interface Toolkit This page left blank intentionally ...
Page 106: ...98 PMCS Interface Toolkit This page left blank intentionally ...
Page 262: ......
Page 270: ...262 PMCS Interface Toolkit This page left blank intentionally ...
Page 286: ...278 PMCS Interface Toolkit This page left blank intentionally ...