Power-Up Test (see Figure 3.1)
© 2014 General Electric Company – All rights reserved.
ADTS Safety and Installation Guide-English | 11
3. ADTS5xxF
Figure 3-1: ADTS542F Front Panel (See Figure 4-1 for other variants)
3.1 Power-Up Test (see Figure 3.1)
1.
Fit “Pitot” (Pt) (1) and “Static” (Ps) (2) port blanks.
2.
Ensure that the test set is connected to an external power supply and the supply is
switched on.
3.
Use the On/Standby Switch (3) on the front of the test set to switch the test set on.
The test set performs a self test, resulting in a test set status indication (4a) “Pass” or
“Fault”.
1
3
6
2
4
5
7
8
Summary of Contents for Druck ADTS 542F
Page 2: ......
Page 19: ......
Page 22: ......
Page 39: ......
Page 42: ......
Page 59: ......
Page 62: ......
Page 79: ......
Page 82: ......
Page 99: ......
Page 102: ......
Page 119: ......
Page 122: ......
Page 139: ......
Page 142: ......
Page 159: ......
Page 162: ......
Page 179: ......
Page 182: ......
Page 199: ......
Page 202: ......
Page 219: ......
Page 222: ......
Page 226: ...আ 1 ॾ এѐ 226 ADTS Ҷչ ܶ ԧ И ކ 2014 General Electric Company ґऊ۱߄ߓӯ澞 ...
Page 238: ...আ 4 ॾ ઁࠀ 238 ADTS Ҷչ ܶ ԧ И ކ 2014 General Electric Company ґऊ۱߄ߓӯ澞 ...
Page 239: ......
Page 242: ......
Page 246: ...ਸ਼ 1 ฆ 峙峂 峫 峕 246 ADTS 岴 峲 峝 ਝ 崔 崌 崱 মୁ 2014 General Electric Company All rights reserved ...
Page 258: ...ਸ਼ 4 ฆ ல 258 ADTS 岴 峲 峝 ਝ 崔 崌 崱 মୁ 2014 General Electric Company All rights reserved ...
Page 259: ......