g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
75/88
Operating
Manual
SG Series
10, 20, 30 & 40 kVA
7.4.7 Restore to normal operation after “
total off”
View of the panel after pressing the button
“
total off
”
.
•
All
Contacts
are open;
•
Rectifier
,
Inverter
and
Static-Switch
shutdown.
First operated unit
All other units of the system
1. Reset
“
total off
”
by pressing and holding the “
total off
”
button and then the
“
inverter on
”
( I )
key, on any of the Units simultaneously, until
Load
is supplied
from
Bypass
and the
Rectifiers
start.
•
System output connects to
Bypass Utility
.
•
Rectifiers
start with blinking LED.
•
At the end of Soft-start the
LED’s
remains lit.
•
The
LCD screen
on all
Units
shows:
“
LOAD ON BYPASS
”.
First operated unit
All other units of the system
2. Connect the Battery to all Units by closing the external Battery Switch(es) or
Fuses
.
Continue
►