![GE Digital Energy SG 10 Operating Manual Download Page 44](http://html.mh-extra.com/html/ge/digital-energy-sg-10/digital-energy-sg-10_operating-manual_133039044.webp)
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
44/88
Operating
Manual
SG Series
10, 20, 30 & 40 kVA
7.1.2 Maintenance shutdown (Load on Q2)
Initial status:
Load supplied from Inverter
.
1. Press
“
inverter off
”
( O ) key and hold
until the LED inside the Inverter symbol
turns OFF
.
•
Load
is transferred to
Utility
.
•
Inverter
shuts down.
•
LED Inverter
must be OFF.
The
LCD screen
must display the status
“
LOAD ON BYPASS
”.
2. Close Q2 (Pos. I)
.
•
Load
is now supplied parallel through
Bypass
and
Q2
.
•
LED
for
Manual Bypass
lights up.
3. Open Q1 (Pos. O) and then press
“
total
off
”
button
.
•
Load
is now supplied from
Manual
Bypass
.
•
Rectifier
shuts down and all output and
input
contactors
are opened.
The
LCD panel
must display the main screen, indicating the status
“
LOAD OFF
”
.
4. Disconnect the Battery from the UPS in
case of External Battery
.
•
Wait
5 minutes
for DC-Link Capacitors
discharge.
End of procedure