![GE Digital Energy SG 10 Operating Manual Download Page 69](http://html.mh-extra.com/html/ge/digital-energy-sg-10/digital-energy-sg-10_operating-manual_133039069.webp)
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
69/88
Operating
Manual
SG Series
10, 20, 30 & 40 kVA
7.4.3 From Manual Bypass (Q2) to normal function On-line
Initial status:
Load supplied from Manual Bypass
.
All Q2 of the system closed
.
First operated unit
All other units of the system
1. Connect the Battery to all Units by closing the external Battery Switch(es) or
Fuses
.
2. Close Q1 (Pos. I) on all Units
.
The
Rectifiers
will start automatically and at the closure of
Q1
of the
last Unit
, the
Bypass
of all
Units
will be activated.
First operated unit
All other units of the system
3. Open Q2 (Pos. O) on all Units
.
First operated unit
All other units of the system
Continue
►