7.3
PROCEDURES FOR PARALLEL SYSTEM
7.3.1 Parallel System start-up
Verify on all
Units
, with open front door: Switches
Q1
and
Q2
must be open
(Pos. O).
1. Connect the Utility power on all UPS’s.
(In case of separate inputs for
Rectifier
and
Bypass
, connect both).
•
Power supply starts up. Indicated with flashing
alarm
and
buzzer sounds
.
•
LED’s as indicated will be lit.
•
Press
mute
, to reset
alarm and buzzer
.
First operated unit
All other units of the system
2. Close Q1 (Pos. I) on all Units
.
•
When closing
Q1
on the last unit of the parallel system, the
Bypass
of all
Units
connects to the
Load
.
•
Rectifiers
start automatically, blinking
LED
indicates Soft-start.
•
At the end of
Rectifier
Soft-start, the
LED
remains lit.
•
LED’s service check
turn OFF.
First operated unit
All other units of the system
3. Connect the Battery to all Units by closing the external Battery Switches or
Fuses, in case of External Battery
.
Continue
►