![GE Digital Energy SG 10 Operating Manual Download Page 45](http://html.mh-extra.com/html/ge/digital-energy-sg-10/digital-energy-sg-10_operating-manual_133039045.webp)
g
GE
OPM_SGS_USM_10K_40K_0US_V010.doc
45/88
Operating
Manual
SG Series
10, 20, 30 & 40 kVA
7.1.3 From Manual Bypass (Q2) to normal function On-line
Initial status:
Load supplied from Manual Bypass
.
1. Close Q1 (Pos. I)
.
•
Bypass
connects to
Load
.
LED Load
on
Bypass
lights up.
•
Rectifier
starts automatically and
LED in Rectifier symbol
and
LED
Battery
charge light up.
2. Open Q2 (Pos. O)
.
•
LED Manual Bypass
turns OFF.
3. Connect the Battery to the UPS by closing the Battery Switch or Fuses, in
case of External Battery
.
4.
Press
“
inverter on
”
( I ) key
.
•
Soft-start of
Inverter
, indicated with
blinking
LED
.
•
At the end of Soft-start the
LED
remains lit.
•
Automatic transfer from
Bypass
to
Inverter
.
•
UPS output
LED
indicates
Load on
Inverter
.
The
LCD
must display on the main screen the status
“
LOAD ON INVERTER
”
.
End of procedure