System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
20
WALL BUCKY INSTALLATION
WALL
BUCKY
with/without
with
without
See SM Vertical Bucky Stand SG 100 CE
−
Dir 2150297
−
100, Chapter 1 or SM Vertical
Bucky Stand SG60, Dir 2150293
−
100
Chapter 1.
Step
Description
Done
Supporting Documents
ÍÍ
ÍÍ
Mark each box when done
From previous page
WALL
MOUNTING
KIT
with
without
REMARK:
Use of the Wall Mounting Kit is optional
but strongly recommended with certain kinds of
Hospital wall construction (Unistrut wall). Refer to
SG60 PIM 2150301
−
100 or SG100 PIM 2150305
−
100
.
INSTALLATION
2 Hours
1 Person
Mounting Hardware Kit
ÍÍ
ÍÍ
See SG60 SM 2150293
−
100, Job Card IST001
or SG100 SM 2150297
−
100, Job Card IST001
ÍÍ
2 People
2 Hours
SG60/SG100 Installation
Vertical Leveling
Route System Cables from SG to MPH
Cabinet location
Lateral alignment across the wall to Table
Longitudinal Axis
INSTALLATION
SG60: MIS 5.1
SG100: MIS 5.1
−
9
Continues on next page
A16
A17
REMARK:
Most of these cables are already factory
connected. See MIS MAP / MIS CHART of this
Manual (section 1
−
4)
.
Connections to be done during Installation:
A17
Refer to Inspection Report 2179651 TDR
or 2172166 TDR sections 6.1, 6.2 and 6.3
or
Inspection Report 2167647 TDR,
sections 5.1, 5.2 and 5.3
Summary of Contents for Compax 40E
Page 138: ......