Version No.: 2
SYSTEM COMPAX 40E
Job Card IST 001
1 of
4
Purpose:
X−RAY TUBE & COLLIMATOR
INSTALLATION ON XT SUSPENSION
Date: July 6, 1997
Time:
Personnel:
1
System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
79
SECTION 1
SPARES REQUIRED
SECTION 2
EQUIPMENT REQUIRED
SECTION 3
SAFETY PRECAUTIONS
SECTION 4
PRELIMINARY STEPS
SECTION 5
INSTALLATION PROCEDURES
Recommendation for EMC
During Installation, any disassembly/reassembly or
Preventive
(Electronic Magnetic Compliance)
Maintenance, ensure that each System
Cable shield is properly secure in it’s clamp.
−
Refer to Illustration 9 of this Job Card for clamps location in MPH Cabinet. Use EMC
clamps provided in bag 2206408.
−
For other sub
−
systems, cable shield must be clamped according to MIS CHART marks
(see MIS CHART Chapter 2 of this manual).
−
Ensure that each metal plug is properly secured by its mounting screws (EMC, ground
continuity).
RAFL
−
S Rack Accessibility
To better access the back of the RAFL rack or read the
keyboard display, it is possible to slide out the complete rack after the fixing screws are
removed. Be sure you tilt down the Extension Rack MPHA6 before and that the RAFL Power
Board is well secured. Refer also to Job Card IST002 of MPH Service Manual.