System Service Manual
−
SYSTEM COMPAX 40E, CE Marked
GE HEALTHCARE
with MPH 50/65/80 (including XT, RS 85 and Tomo
−
Link)
REV 9
DIRECTION 2154260
−
100
17
Continues on next page
See Job Card IST001 of this manual for
X
−
Ray Tube and Collimator installation
and levelling.
CAUTION:
X
−
Ray Tube and Collimator
are factory aligned and assembled during
HLA.
The mounting ring should be
not
be
adjusted during installation .
Step
Description
Done
Supporting Documents
Í
Í
Mark each box when done
From previous page
X
−
Ray Tube
Collimator Head (SA/SM)
INSTALLATION
2 people
A4
−
A5=16 Hours
ÍÍ
ÍÍ
Tomo
−
Link
with/without
Without
With
INSTALLATION
Drive Unit
Yoke
Fulcrum Arm Support (Wall)
Operator Control Console
2 People
8 Hrs
ÍÍ
ÍÍ
Refer to Inspection Report 2179651 TDR,
section 5.1
A5
A6
Refer to Inspection Report 2179651 TDR
or 2167647 TDR, sections 2.1 and 3.1
Refer to Tomo
−
Link SM 2133821
−
100
sections 1,2,5
Summary of Contents for Compax 40E
Page 138: ......