Action
Step
Remove the O-rings and seals and replace these with new O-rings and seals.
Tip:
Warming the new O-rings and seals in warm water (50°C) will make them
more pliable and easier to mount onto the adapter.
6
Replace the seal protecting the leakage detection system aperture with a
new seal.
7
Replace the upper bed support seal. It may be necessary to warm the seal
by placing it in warm water (50°C) before replacing.
8
Adapter rod
There is an O-ring under the adapter rod in the region of contact between the rod and
the adapter. To change this O-ring:
Action
Step
Make sure that the adapter and the adapter rod are resting on a stable
surface.
1
Remove the bolts from the base of the adapter rod using a Hex/Allen key.
2
LPLC and MPLC Columns Operating Instructions 28-9638-66 AC
79
6 Maintenance
6.2 Changing O-rings and seals