5.2
Priming the column
Introduction
This section describes how to prime the column to remove air from the column and bed
supports before the column is packed.
Hydraulic chamber priming
NOTICE
The hydraulic fluid tank must be filled with hydraulic fluid or other
bacteriostatic solution before the hydraulic chamber priming pro-
cedure is performed.
To perform hydraulic chamber priming, follow the steps described below:
MPB
MPT
C
B
D
A
BSV
HO
HI
Action
Step
Connect the column and tanks as shown in the above illustration.
1
Open the hydraulic chamber inlet (HI) and outlet (HO).
2
52
LPLC and MPLC Columns Operating Instructions 28-9638-66 AC
5 Operation
5.2 Priming the column