
P50 Agile P153
5 Configuration
P153/EN M/B
5-7
2.1
Changing the Settings
SYSTEM DATA
Step 1: Press the (
4
) key to move to the next option.
Language
English
Step 2: Press the (
6
) key to move to the next option till the relay
displays CB Open/Close setting
: : :
: : :
CB Open/Close
Open
Step 3: Press the (
6
) key till the relay displays this option.
Press ‘EDIT’ key to edit the setting.
Password = 0001
[All editable settings are password protected. So when the ‘EDIT’ key is
pressed, it will display the password and the settable number/text will
start blinking].
Step 4: Enter the password by using the (
5
) or the (
6
) key. The
Password is four (4) digits alpha numeric.
Password = 0000
** Password OK **
Step 5: After editing the Password, press the ‘EDIT’ key, the Password
OK message is displayed and settable number/text will start blinking and
the relay will move to the next option.
Note: When the password is set, modification can be done in any
settings within 15 minutes. After the lapse of 15 minutes, the relay will
once again ask to re-enter the password.
CB Open/Close
Open
Step 6: By using the (
5
) or (
6
) key, the desired selection can be set
as shown in the display.
CB Open/Close
Close
Step 7: After setting, press the ‘EDIT’ key, the text will stop blinking and
move to the next option.
Step 8: Press the (
3
) / (
4
) key, it will ask if you want to save the
settings and move to the next option.
(
3
) For Save
CLEAR For Cancel
Step 9: When the (
3
) key is pressed again, it will save the changes
and move to the next option.
SAVE Settings
This window will flash for a moment and the control will return to the
main menu.
SYSTEM DATA
Summary of Contents for Agile P50 Series
Page 3: ...P50 Agile P153 1 Introduction P153 EN M B 1 1 INTRODUCTION CHAPTER 1...
Page 4: ...1 Introduction P50 Agile P153 1 2 P153 EN M B...
Page 10: ...1 Introduction P50 Agile P153 1 8 P153 EN M B...
Page 11: ...P50 Agile P153 2 Safety Information P153 EN M A 2 1 SAFETY INFORMATION CHAPTER 2...
Page 22: ...Chapter 2 Safety Information P50 Agile P153 2 12 P153 EN M A...
Page 23: ...P50 Agile P153 3 Hardware Design P153 EN M B 3 1 HARDWARE DESIGN CHAPTER 3...
Page 24: ...3 Hardware Design P50 Agile P153 3 2 P153 EN M B...
Page 32: ...3 Hardware Design P50 Agile P153 3 10 P153 EN M B...
Page 33: ...P50 Agile P153 4 Front Panel P153 EN M B 4 1 FRONT PANEL CHAPTER 4...
Page 34: ...4 Front Panel P50 Agile P153 4 2 P153 EN M B...
Page 39: ...P50 Agile P153 5 Configuration P153 EN M B 5 1 CONFIGURATION CHAPTER 5...
Page 40: ...P50 Agile P153 5 Configuration P153 EN M B 5 2...
Page 150: ...P50 Agile P153 5 Configuration P153 EN M B 5 112...
Page 151: ...P50 Agile P153 6 Protection Functions P153 EN M B 6 1 PROTECTION FUNCTIONS CHAPTER 6...
Page 152: ...6 Protection Functions P50 Agile P153 6 2 P153 EN M B...
Page 168: ...7 Protection Parameter Settings P50 Agile P153 7 2 P153 EN M B...
Page 189: ...P50 Agile P153 8 Monitoring Control P153 EN M B 8 1 MONITORING CONTROL CHAPTER 8...
Page 190: ...8 Monitoring Control P50 Agile P153 8 2 P153 EN M B...
Page 207: ...P50 Agile P153 9 SCADA Communications P153 EN M B 9 1 SCADA COMMUNICATIONS CHAPTER 9...
Page 208: ...12 SCADA Communications P50 Agile P153 9 2 P153 EN M B...
Page 220: ...12 SCADA Communications P50 Agile P153 9 14 P153 EN M B...
Page 221: ...P50 Agile P153 10 Installation P153 EN M B 10 1 INSTALLATION CHAPTER 10...
Page 222: ...10 Installation P50 Agile P153 10 2 P153 EN M B...
Page 234: ...13 Commissioning Instructions P50 Agile P153 13 2 P153 EN M B...
Page 242: ...12 Maintenance and Troubleshooting P50 Agile P153 12 2 P153 EN M B...
Page 250: ...12 Maintenance and Troubleshooting P50 Agile P153 12 10 P153 EN M B...
Page 252: ...13 Technical Specifications P50 Agile P153 13 2 P153 EN M B...
Page 263: ...P50 Agile P153 14 Wiring Diagrams P153 EN M B 14 1 WIRING DIAGRAMS CHAPTER 14...
Page 264: ...14 Wiring Diagrams P50 Agile P153 14 2 P153 EN M B...
Page 267: ......