
13 Technical Specifications
P50 Agile P153
13-12
P153/EN M/B
6.
Environmental tests
6.2
Cold test
IEC 60255-1,
IEC 60068-2-1: 2007
Start-up +20 °C (EUT energised)
Functional verification tests for 2 hours
Intermediate 0°C (EUT energised)
Functional verification tests for 2 hours
Intermediate -10°C (EUT energised)
Functional verification tests for 2 hours
Low temperature - 25°C (EUT
energised)
Functional verification tests for 96 hours
Low temperature -25°C (EUT not
energised)
Storage for 96 hours
Cold start -25°C (EUT energised)
Operate for 2 hours
Last test +20°C (EUT energised)
Functional verification tests for 2 hours
6.3
Change of
temperature
test
IEC 60255-1,
EN 60068-2-14:2009 Nb
Lower temperature
-25°C
Higher temperature
+65°C
Rate of change of temperature
1°C/min
Duration of exposure
5 cycle
Duration of cycle
3 + 3 hrs.
EUT condition
Energised
6.4
Damp heat
steady state
test
EN 60068-2-78, EN60068-2-30
Operating temperature
+65°C
Humidity
93%
Duration of exposure
10 days
EUT condition
Energised
6.5
Damp heat
cyclic test
IEC60068-2-30
Lower temperature
+25°C
Humidity
97%
Higher temperature
+65°C
Humidity
93%
Duration of exposure
6 cycle
Duration of cycle
12 + 12 hrs.
EUT condition
Energised
6.6
Enclosure
protection
EN 60529:2000
IP52
For Front
IP20
For Rear
EUT Condition
Non energised
Summary of Contents for Agile P50 Series
Page 3: ...P50 Agile P153 1 Introduction P153 EN M B 1 1 INTRODUCTION CHAPTER 1...
Page 4: ...1 Introduction P50 Agile P153 1 2 P153 EN M B...
Page 10: ...1 Introduction P50 Agile P153 1 8 P153 EN M B...
Page 11: ...P50 Agile P153 2 Safety Information P153 EN M A 2 1 SAFETY INFORMATION CHAPTER 2...
Page 22: ...Chapter 2 Safety Information P50 Agile P153 2 12 P153 EN M A...
Page 23: ...P50 Agile P153 3 Hardware Design P153 EN M B 3 1 HARDWARE DESIGN CHAPTER 3...
Page 24: ...3 Hardware Design P50 Agile P153 3 2 P153 EN M B...
Page 32: ...3 Hardware Design P50 Agile P153 3 10 P153 EN M B...
Page 33: ...P50 Agile P153 4 Front Panel P153 EN M B 4 1 FRONT PANEL CHAPTER 4...
Page 34: ...4 Front Panel P50 Agile P153 4 2 P153 EN M B...
Page 39: ...P50 Agile P153 5 Configuration P153 EN M B 5 1 CONFIGURATION CHAPTER 5...
Page 40: ...P50 Agile P153 5 Configuration P153 EN M B 5 2...
Page 150: ...P50 Agile P153 5 Configuration P153 EN M B 5 112...
Page 151: ...P50 Agile P153 6 Protection Functions P153 EN M B 6 1 PROTECTION FUNCTIONS CHAPTER 6...
Page 152: ...6 Protection Functions P50 Agile P153 6 2 P153 EN M B...
Page 168: ...7 Protection Parameter Settings P50 Agile P153 7 2 P153 EN M B...
Page 189: ...P50 Agile P153 8 Monitoring Control P153 EN M B 8 1 MONITORING CONTROL CHAPTER 8...
Page 190: ...8 Monitoring Control P50 Agile P153 8 2 P153 EN M B...
Page 207: ...P50 Agile P153 9 SCADA Communications P153 EN M B 9 1 SCADA COMMUNICATIONS CHAPTER 9...
Page 208: ...12 SCADA Communications P50 Agile P153 9 2 P153 EN M B...
Page 220: ...12 SCADA Communications P50 Agile P153 9 14 P153 EN M B...
Page 221: ...P50 Agile P153 10 Installation P153 EN M B 10 1 INSTALLATION CHAPTER 10...
Page 222: ...10 Installation P50 Agile P153 10 2 P153 EN M B...
Page 234: ...13 Commissioning Instructions P50 Agile P153 13 2 P153 EN M B...
Page 242: ...12 Maintenance and Troubleshooting P50 Agile P153 12 2 P153 EN M B...
Page 250: ...12 Maintenance and Troubleshooting P50 Agile P153 12 10 P153 EN M B...
Page 252: ...13 Technical Specifications P50 Agile P153 13 2 P153 EN M B...
Page 263: ...P50 Agile P153 14 Wiring Diagrams P153 EN M B 14 1 WIRING DIAGRAMS CHAPTER 14...
Page 264: ...14 Wiring Diagrams P50 Agile P153 14 2 P153 EN M B...
Page 267: ......