GLOSSARY
Adjust
To bring to a more satisfactory state; to manipulate controls, levers, linkages, etc. to
return equipment from an out-of-tolerance condition to an in-tolerance condition.
Align
To bring into line; to line up; to bring into precise adjustment, correct relative position
or coincidence.
Assemble
To fit and secure together the several parts of; to make or form by combining parts.
Calibrate
To determine accuracy, deviation or variation by special measurement or by
comparison with a standard.
Check
Make a comparison of a measure of time, pressure, temperature, resistance,
dimension or other quality with a known figure for that measurement.
Disconnect
To detach the connection between; to separate keyed or matched equipment parts.
Dismantle
To take apart to the level of the next smaller unit or down to all removable parts.
Examine
To perform a critical visual observation or check for specific conditions; to test the
condition of.
Fit
Correctly attach one item to another.
Inspect
Review the work carried out by Specialists to ensure it has been performed
satisfactorily.
Install
To perform operations necessary to properly fit an equipment unit into the next larger
assembly or system.
Maintain
To hold or keep in any particular state or condition especially in a state of efficiency or
validity.
Operate
Make sure that an item or system functions correctly as far as possible without the
use of test equipment or reference to measurement.
Readjust
To adjust again; to move back to a specified condition; to bring back to an in-
tolerance condition.
Reconnect
To rejoin or refasten that which has been separated.
Refit
Fit an item which has previously been removed.
Remove
To perform operations necessary to take an equipment unit out of the next larger
assembly or system. To take off or eliminate. To take or move away.
Repair
To restore damaged, worn out or malfunctioning equipment to a serviceable, usable
or operable condition.
Summary of Contents for ADTS552F
Page 19: ...Chapter 1 Introduction...
Page 30: ...DUAL HAND TERMINAL EN English 19 K0553 Revision D Figure 1 8 ADTS Touch Slave...
Page 31: ...Chapter 2 Installation...
Page 34: ...PACKING FOR STORAGE OR TRANSPORTATION EN English 24 K0553 Revision D...
Page 40: ...Chapter 3 Operation...
Page 114: ...Chapter 4 Calibration...
Page 123: ...Chapter 5 Maintenance...
Page 132: ...Chapter 6 Testing and Fault Finding...
Page 152: ...Chapter 7 Specification...