Power/Vac
Test Cabinet
Section 4. Installation
The test cabinet should be installed on the wall at a
location where maintenance and testing of the breaker
can be conveniently done.
Make sure that the green ground conductor is connected
to electrical ground.
Conduits may be installed for cables to supply control
power for testing. Two 1-inch diameter grommets are
located on top accomodate wiring. Refer to the wiring
diagrams figures 2, 3, and 4 for control power
connections.
Section 5. Maintenance
The contact surfaces of the coupler require periodic
lubrication to inhibit oxidation and minimize friction. It
is recommended that during each maintenance interval,
the pins of the breaker coupler be lightly coated with
0282A2048P009 grease.
Aside from keeping the unit clean and dry, the most
important thing is to return the clamp to the cabinet area
when not connected to a breaker.
Fig. 2. Test Cabinet Outline Drawing
6
Summary of Contents for 15LSWGR901
Page 59: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...equipment not ...
Page 94: ......
Page 95: ...the Fig 3 89184386 ...
Page 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Page 97: ...Figs ...
Page 98: ...charge ...
Page 99: ......
Page 100: ......
Page 101: ...Fig 7 0209B4649 1 Rev 1 ...
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ...copper and bushings ...
Page 108: ......
Page 109: ...drawings particular ...
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ...lower followed Fig 32 ...
Page 121: ......
Page 122: ...in against ...
Page 123: ...ground sheath risers convenient ...
Page 124: ...ground in ...
Page 125: ......
Page 126: ...until it will be a ...
Page 127: ...conductor DE APPARATUS THE FICE then ...
Page 128: ...the Fig 40 891439D 1 ...
Page 129: ...MAKE THE FIG 42 891848 ...
Page 130: ...in ...
Page 131: ...responsible policy Fig 45 8918438H ...
Page 132: ...be enamel ...
Page 133: ...sealer be this Fig 46 8042976 ...
Page 134: ......
Page 135: ...50 49 ...
Page 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Page 137: ...Fig 54 ...
Page 149: ......
Page 150: ...62 Intentionally Left Blank ...
Page 151: ...63 Intentionally Left Blank ...
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...6 ...
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 166: ......
Page 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Page 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Page 186: ...10 ...
Page 187: ...11 ...