52
Fig – A(1)-3
View looking up into the front bottom compartment of a 2 High-A rollout stack
Step – 2, Remove vertical mid barrier in front lower compartment
Remove the vertical mid barrier located in the upper part of the lower front compartment.
This barrier is located approximately 49 inch from the front of the stack. See Fig – A(1)-
4a for identification of barrier in the breaker compartment and A(1)-4b for identification
of barrier in a PT/CPT rollout compartment
Step – 3, Remove vertical mid barrier in front upper compartment
Remove the vertical mid barrier located in the lower part of the upper front compartment.
This barrier is located approximately 49 inch from the front of the stack. See item # 3 of
This barrier can be
removed when the 3
taptites are removed.
Remove this
barrier
The underside of
the taptites
Remove this
barrier
Fig A(1)-4a
View looking into typical
front lower breaker
compartment
Fig A(1)-4b
View looking into typical
front lower PT/CPT rollout
compartment
Summary of Contents for 15LSWGR901
Page 59: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...equipment not ...
Page 94: ......
Page 95: ...the Fig 3 89184386 ...
Page 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Page 97: ...Figs ...
Page 98: ...charge ...
Page 99: ......
Page 100: ......
Page 101: ...Fig 7 0209B4649 1 Rev 1 ...
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ...copper and bushings ...
Page 108: ......
Page 109: ...drawings particular ...
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ...lower followed Fig 32 ...
Page 121: ......
Page 122: ...in against ...
Page 123: ...ground sheath risers convenient ...
Page 124: ...ground in ...
Page 125: ......
Page 126: ...until it will be a ...
Page 127: ...conductor DE APPARATUS THE FICE then ...
Page 128: ...the Fig 40 891439D 1 ...
Page 129: ...MAKE THE FIG 42 891848 ...
Page 130: ...in ...
Page 131: ...responsible policy Fig 45 8918438H ...
Page 132: ...be enamel ...
Page 133: ...sealer be this Fig 46 8042976 ...
Page 134: ......
Page 135: ...50 49 ...
Page 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Page 137: ...Fig 54 ...
Page 149: ......
Page 150: ...62 Intentionally Left Blank ...
Page 151: ...63 Intentionally Left Blank ...
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...6 ...
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 166: ......
Page 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Page 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Page 186: ...10 ...
Page 187: ...11 ...