2
Medium voltage switchgear
from a a company you can trust
Reaching from 4.76kV to 38kV and including leading-edge arc resistant
technology across the line, GE delivers medium voltage switchgear
solutions for every application, everywhere.
GE has reached agreement with
Powell to provide 27kV and 38kV
switchgear as well as a full range
of arc resistant technology to
allow us to meet the increasingly
demanding requirements of medium
voltage switchgear users. The scope
of the combined line is matched by
the depth of the engineering and the
unsurpassed level of performance
and reliability.
This is one more unmistakable sign
of GE’s long-term commitment to
delivering the complete range of
electrical distribution equipment
and systems you need for every
industrial application.
Arc Resistant Switchgear
4.76kV – 38kV
PV System 27
®
and PV System 38
®
27kV – 38kV
POWER/VAC
®
4.76kV – 15kV
Summary of Contents for 15LSWGR901
Page 59: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...equipment not ...
Page 94: ......
Page 95: ...the Fig 3 89184386 ...
Page 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Page 97: ...Figs ...
Page 98: ...charge ...
Page 99: ......
Page 100: ......
Page 101: ...Fig 7 0209B4649 1 Rev 1 ...
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ...copper and bushings ...
Page 108: ......
Page 109: ...drawings particular ...
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ...lower followed Fig 32 ...
Page 121: ......
Page 122: ...in against ...
Page 123: ...ground sheath risers convenient ...
Page 124: ...ground in ...
Page 125: ......
Page 126: ...until it will be a ...
Page 127: ...conductor DE APPARATUS THE FICE then ...
Page 128: ...the Fig 40 891439D 1 ...
Page 129: ...MAKE THE FIG 42 891848 ...
Page 130: ...in ...
Page 131: ...responsible policy Fig 45 8918438H ...
Page 132: ...be enamel ...
Page 133: ...sealer be this Fig 46 8042976 ...
Page 134: ......
Page 135: ...50 49 ...
Page 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Page 137: ...Fig 54 ...
Page 149: ......
Page 150: ...62 Intentionally Left Blank ...
Page 151: ...63 Intentionally Left Blank ...
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...6 ...
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 166: ......
Page 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Page 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Page 186: ...10 ...
Page 187: ...11 ...