06/06/2005
Addendum #1 to GEK-39672G
Instructions for making bus connections across shipping split sections
Introduction
PowerVac switchgear is shipped in splits of one, two, three or four stacks. When
connecting shipping splits together it may be required to make the connections across the
main bus or the tie bus. The main bus can be accessed from the front of the gear through
the breaker compartment and the tie bus can be accessed from the rear. Breakers and
rollouts should be removed from the switchgear before the bus connections can be made
across the shipping split.
This addendum supplements the instructions provided in the main body of the instruction
book in pages 28 to 32. Ground bus connections across shipping splits shall be made as
specified in page 35 of the instruction book.
WARNING : All primary and secondary circuit devices must be de-energized and the
primary circuit grounded before undertaking any work on the switchgear.
Main bus connections across the shipping split
Step – 1, Remove horizontal barrier
A horizontal barrier located between the front upper and lower compartments has to be
removed. This barrier is shown in Fig – A(1)-1.
If heaters are provided, the heater shown in Fig – A(1)-1 will have to be removed in order
to remove the horizontal barrier.
Do not remove the pan on which the breaker ground shoe is located. Item # 4 in Fig –
A(1)-1. In most cases the pan shown as item #4 will have a cover over it ( cover not
shown in Fig A(1)-1). It is not required to remove the cover.
Summary of Contents for 15LSWGR901
Page 59: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...equipment not ...
Page 94: ......
Page 95: ...the Fig 3 89184386 ...
Page 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Page 97: ...Figs ...
Page 98: ...charge ...
Page 99: ......
Page 100: ......
Page 101: ...Fig 7 0209B4649 1 Rev 1 ...
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ...copper and bushings ...
Page 108: ......
Page 109: ...drawings particular ...
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ...lower followed Fig 32 ...
Page 121: ......
Page 122: ...in against ...
Page 123: ...ground sheath risers convenient ...
Page 124: ...ground in ...
Page 125: ......
Page 126: ...until it will be a ...
Page 127: ...conductor DE APPARATUS THE FICE then ...
Page 128: ...the Fig 40 891439D 1 ...
Page 129: ...MAKE THE FIG 42 891848 ...
Page 130: ...in ...
Page 131: ...responsible policy Fig 45 8918438H ...
Page 132: ...be enamel ...
Page 133: ...sealer be this Fig 46 8042976 ...
Page 134: ......
Page 135: ...50 49 ...
Page 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Page 137: ...Fig 54 ...
Page 149: ......
Page 150: ...62 Intentionally Left Blank ...
Page 151: ...63 Intentionally Left Blank ...
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...6 ...
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 166: ......
Page 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Page 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Page 186: ...10 ...
Page 187: ...11 ...