Sludge Dewatering and Odor Control at Plant 1
Specification: 16340
Project No. P1-101
Medium Voltage Switchgear
Designation
Shop Order
SWITCHGEAR SWGR-Q-A ( 15LSWGR901 )
111027-01
SWITCHGEAR SWGR-Q-B ( 15LSWGR902 )
111027-04
12.47KV SERVICE CENTER ADDITIONS
111027-01
General Procedures
Startup: Normal/Emergency
Device/System
Publication/Drawing
Vol.
Tab
Medium Voltage Switchgear
GEK-39672
Page 36
1
3A
Medium Voltage Breakers
01.4IB.66000A
Chapter 4
1
3A
Operation: Normal/Emergency
*
Refer to the publication/drawing listed below for operation of the following:
Device/System
Publication/Drawing
Vol.
Tab
Medium Voltage Switchgear
GEK-39672
Page 36
1
3A
Medium Voltage Breakers
01.4IB.66000A
Chapter 3
1
3A
Breaker/PT Lift Cart
GEK-90214
Complete
1
3A
Breaker Test Cabinet
GEK-105263
Complete
1
3A
Ground & Test Device
GEK-90212
Complete
1
3A
Shutdown: Normal
*
Open feeder breakers to disconnect loads.
*
Shutdown: Emergency
*
Open each Main Breaker to remove the respective switchgear bus from upstream power system.
Location
Open each Main Breaker to remove the respective switchgear bus from upstream power system.
480-Z7612-16340-SOI
Supplemental Operational Information
Location
Operation / Maintenance
Summary of Contents for 15LSWGR901
Page 59: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ...equipment not ...
Page 94: ......
Page 95: ...the Fig 3 89184386 ...
Page 96: ...Fig 5 0209B4678 Rev 0 Fig 5 0209B4645 Rev 0 ...
Page 97: ...Figs ...
Page 98: ...charge ...
Page 99: ......
Page 100: ......
Page 101: ...Fig 7 0209B4649 1 Rev 1 ...
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ...copper and bushings ...
Page 108: ......
Page 109: ...drawings particular ...
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ...lower followed Fig 32 ...
Page 121: ......
Page 122: ...in against ...
Page 123: ...ground sheath risers convenient ...
Page 124: ...ground in ...
Page 125: ......
Page 126: ...until it will be a ...
Page 127: ...conductor DE APPARATUS THE FICE then ...
Page 128: ...the Fig 40 891439D 1 ...
Page 129: ...MAKE THE FIG 42 891848 ...
Page 130: ...in ...
Page 131: ...responsible policy Fig 45 8918438H ...
Page 132: ...be enamel ...
Page 133: ...sealer be this Fig 46 8042976 ...
Page 134: ......
Page 135: ...50 49 ...
Page 136: ...Fig 53 Fig 52 Fig 51 8043114 ...
Page 137: ...Fig 54 ...
Page 149: ......
Page 150: ...62 Intentionally Left Blank ...
Page 151: ...63 Intentionally Left Blank ...
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ...6 ...
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 166: ......
Page 174: ...Fig 4 Test Cabinet Wiring Diagram for 2 Trip C 8 ...
Page 175: ...Fig 5 Test Cabinet Wiring Diagram for 1 Trip Coil UVTD 9 ...
Page 186: ...10 ...
Page 187: ...11 ...