![GE Intelligent Platforms, Inc. PAC8000 Getting Started Manual Download Page 132](http://html.mh-extra.com/html/ge-intelligent-platforms-inc/pac8000/pac8000_getting-started-manual_571899132.webp)
132
PAC8000 Workbench Getting Started Guide
Additional Information
The Project Tutorial has taken you through the process of creating, downloading, and
troubleshooting a basic control strategy. Due to the high-level nature of this Getting
Started Guide, you will certainly require additional information as you become more
familiar with the Workbench. Some common functions for which you may require
additional resources include:
•
Project Backups
- Once the project is complete, it should be backed up so that
a zip file of the backed up project can be placed in a safe location for subsequent
use. This process is discussed in the online Help topic
How to Backup a Project
and the
Backing up a Project
lab
in the Training Guide.
•
Reports
- Please refer to the
Reports
section in the online Help or
Reports
section in the Training Guide for a complete discussion of the reporting functions
that are built into the Workbench.
•
Diagnostics and Troubleshooting
- A detailed discussion of troubleshooting
and maintenance features is available in the Maintenance course. For more
information about this course, please visit the Website:
www.ge-ip.com/support
.
•
HMI Graphics and Alarming
- Please refer to the documentation that comes
with your HMI for a detailed discussion of these features. If your HMI is InTouch,
IO and Controller tags are set up to automatically alarm. A detailed discussion
can be found in the
External Application/HMI Interface
section of the online
Help.
•
Training
- GE offers a comprehensive set of training classes for those who will
be using the PAC8000 products. For more information about these courses,
please visit the Website:
www.ge-ip.com/support
.
GE Intelligent Platforms, Inc.
September 2010