F-60+ Operation and Maintenance Manual
Operation
© GBC Pro-Tech 1999 April
3-13
352&(66&21752/&+$57
Product:_________________________
Process: Cold Overlamination _________
Date:________________
352&(66&21752/',$*5$0
Cold Overlamination
FRONT CONTROL SETTINGS
Speed: 0-6 fpm (0-180 cpm)
Reverse/Forward: Forward
Roll Pressure: 30-60%
Top Heater: 105 °F (40 °C)
Cooling: Off
Bottom Heater: 32 °F (0 °C)
Pro
Gloss
Craft
Paper
Release
Paper
Rewind
Optional
Summary of Contents for 930-028
Page 10: ...Safety F 60 Operation and Maintenance Manual 1 6 GBC Pro Tech 1999 April Blank page...
Page 36: ...Operation F 60 Operation and Maintenance Manual 3 18 GBC Pro Tech 1999 April Blank page...
Page 44: ...Warranty F 60 Operation and Maintenance Manual 5 2 GBC Pro Tech 1999 April Blank page...
Page 46: ...Specifications F 60 Operation and Maintenance Manual 6 2 GBC Pro Tech 1999 April Blank page...