F-60+ Operation and Maintenance Manual
Operation
© GBC Pro-Tech 1999 April
3-11
352&(66&21752/&+$57
Product:_________________________
Process: One Pass Mount & Laminate __
Date:________________
352&(66&21752/',$*5$0
One Pass Mount and Laminate
☞
NOTE
Footswitch may be used.
FRONT CONTROL SETTINGS
Speed: 1-2 fpm (30-60 cpm)
Reverse/Forward: Forward
Roll Pressure: Trial
Top Heater: 240 °F (115 °C)
Cooling: Off
Bottom Heater: 32 °F (0 °C)
Printed
Image
Falcon
Board
Leader
Board
Summary of Contents for 930-028
Page 10: ...Safety F 60 Operation and Maintenance Manual 1 6 GBC Pro Tech 1999 April Blank page...
Page 36: ...Operation F 60 Operation and Maintenance Manual 3 18 GBC Pro Tech 1999 April Blank page...
Page 44: ...Warranty F 60 Operation and Maintenance Manual 5 2 GBC Pro Tech 1999 April Blank page...
Page 46: ...Specifications F 60 Operation and Maintenance Manual 6 2 GBC Pro Tech 1999 April Blank page...