Operation
F-60+ Operation and Maintenance Manual
3-10
© GBC Pro-Tech 1999 April
352&(66&21752/&+$57
Product: _________________________
Process: One Pass Mounting___________
Date: ________________
352&(66&21752/',$*5$0
One Pass Mounting
☞
NOTE
Footswitch may be used.
FRONT CONTROL SETTINGS
Speed: 2-3 fpm (60-90 cpm)
Reverse/Forward: Forward
Roll Pressure: Trial
Top Heater: 240 °F (115 °C)
Cooling: Off
Bottom Heater: 32 °F (0 °C)
Printed
Image
Falcon
Board
Leader
Board
Summary of Contents for 930-028
Page 10: ...Safety F 60 Operation and Maintenance Manual 1 6 GBC Pro Tech 1999 April Blank page...
Page 36: ...Operation F 60 Operation and Maintenance Manual 3 18 GBC Pro Tech 1999 April Blank page...
Page 44: ...Warranty F 60 Operation and Maintenance Manual 5 2 GBC Pro Tech 1999 April Blank page...
Page 46: ...Specifications F 60 Operation and Maintenance Manual 6 2 GBC Pro Tech 1999 April Blank page...