
2.0
— 161 —
12 October 2012
Prepare for flight
Preparation of the X100 for launch
The GPS antenna needs to be screwed onto the eBox to ensure a locked GPS signal of the
X100.
1
Screw the GPS antenna clockwise onto the GPS antenna connector of the eBox.
N
OTE
: Tighten it hand-tight, do not overstrain.
N
OTE
: To remove the GPS antenna from the eBox, unscrew it counterclockwise.
19.5.3
Prepare the camera settings for flight
Before each flight, you have to check if the camera settings suffice for the current project or
need to be changed. Take pictures with different settings and compare them with each other.
You should strive for the best settings for the current situation (weather conditions, time of day,
...) and location:
Change picture quality/size
1
Press the MENU/OK button to enter the menu.
2
Picture Quality/Size is selected. Press right once to see the possible values.
3
Select F3648 (10M).
4
Press the MENU/OK button to confirm.
Parameter
Optimal
Minimal
Focus
∞ (infinity)
∞ (infinity)
Shutter speed
1/1250 or higher
1/800
ISO setting
100
400
Picture quality/size
M
M
Summary of Contents for X100UAS
Page 1: ...X100 SYSTEM MANUAL X100 UAS ...
Page 2: ......
Page 13: ...2 0 13 12 October 2012 24 Maintenance 209 24 1 Update the Autopilot settings file 209 ...
Page 14: ...2 0 14 12 October 2012 ...
Page 18: ...2 0 18 12 October 2012 Terms and conventions Conversion table ...
Page 40: ...2 0 40 12 October 2012 X100 parts Check the elevon response ...
Page 66: ...2 0 66 12 October 2012 eBox Make the X100 exit ERROR mode ...
Page 70: ...2 0 70 12 October 2012 Antennas Screw the data link antenna on the eBox ...
Page 90: ...2 0 90 12 October 2012 Launcher Launch the X100 ...
Page 110: ...2 0 110 12 October 2012 Tracker Track down an X100 ...
Page 120: ...2 0 120 12 October 2012 Quickfield Create a flight plan ...
Page 132: ...2 0 132 12 October 2012 Horizon End a flight ...
Page 136: ...2 0 136 12 October 2012 Datalog Viewer Collect and save the log files ...
Page 182: ...2 0 182 12 October 2012 During flight Monitor the landing ...
Page 190: ...2 0 190 12 October 2012 After the flight Clearing the site ...
Page 208: ...2 0 208 12 October 2012 In case of Sudden weather changes ...