
2.0
— 150 —
12 October 2012
Prepare for flight
Monitoring
19.3 Monitoring
19.3.1
Monitor the X100 autopilot initialization
P
REREQUISITES
●
GCS with flight plan exported to Horizon and uploaded to the X100
●
Wireless link between GCS and X100 (LINK field green)
During initialization, the X100 autopilot performs the following actions:
●
Acquire a new GPS lock.
●
Check the elevons and put them in zero position.
●
Initialize the internal sensors (airspeed sensor, accelerometers, altitude pressure sensor,
gyros, ...) of the eBox.
●
Download the flight plan to your GCS (Horizon).
You can monitor the status of the initialization in Horizon.
C
AUTION
: Keep the X100 stable during initialization.
1
Monitor the status of the GPS field and check for any error messages in the warning mes
-
sage field.
2
Once the X100 has acquired a GPS lock (GPS field green), you can monitor the status of
the READY field.
N
OTE
: The initialization of the X100 takes about 25 seconds. In its final steps the aircraft
will move its elevons up and down once.
3
Once the sensors are initialized (READY field green), the flight plan in Horizon is replaced
by a new one which is downloaded from the X100 autopilot. Make sure this is the correct
flight plan for the current flight.
R
ESULT
:
The X100 is fully initialized. Errors occurring during initialization are shown in the warning
message field. Possible errors are:
●
Accelerometer failed when moving the X100 during initialization
●
Fly file invalid command when no POWER CYCLE was performed after uploading the
flight plan
19.3.2
Monitor the battery voltage of the X100
P
REREQUISITES
●
GCS with flight plan exported to Horizon and uploaded to the X100
●
Wireless link between GCS and X100 (LINK field green)
Monitor the battery voltage level of the X100 in Horizon:
Summary of Contents for X100UAS
Page 1: ...X100 SYSTEM MANUAL X100 UAS ...
Page 2: ......
Page 13: ...2 0 13 12 October 2012 24 Maintenance 209 24 1 Update the Autopilot settings file 209 ...
Page 14: ...2 0 14 12 October 2012 ...
Page 18: ...2 0 18 12 October 2012 Terms and conventions Conversion table ...
Page 40: ...2 0 40 12 October 2012 X100 parts Check the elevon response ...
Page 66: ...2 0 66 12 October 2012 eBox Make the X100 exit ERROR mode ...
Page 70: ...2 0 70 12 October 2012 Antennas Screw the data link antenna on the eBox ...
Page 90: ...2 0 90 12 October 2012 Launcher Launch the X100 ...
Page 110: ...2 0 110 12 October 2012 Tracker Track down an X100 ...
Page 120: ...2 0 120 12 October 2012 Quickfield Create a flight plan ...
Page 132: ...2 0 132 12 October 2012 Horizon End a flight ...
Page 136: ...2 0 136 12 October 2012 Datalog Viewer Collect and save the log files ...
Page 182: ...2 0 182 12 October 2012 During flight Monitor the landing ...
Page 190: ...2 0 190 12 October 2012 After the flight Clearing the site ...
Page 208: ...2 0 208 12 October 2012 In case of Sudden weather changes ...