23
5
Open the server according to the instructions on page 24.
6
Follow the ESD precautions described in the previous section when
handling a server component.
Post-installation instructions
Perform the steps below after installing a server component.
1
See to it that all components are installed according to the described
step-by-step instructions.
2
Reinstall any expansion board(s), peripheral(s), bracket(s) and system
cable(s) that have previously been removed.
3
Reinstall the side panel.
4
Reconnect the power, peripheral, and telecommunication cables.
5
Turn on the system.
Summary of Contents for GT110 Series
Page 1: ...GT110 Series User Guide GT110...
Page 15: ...1 System tour...
Page 19: ...5 4 HDD carriers 5 Mainboard 6 PCI slot lock 7 System fan No Component...
Page 27: ...2 System setup...
Page 34: ...2 System setup 20...
Page 35: ...3 System upgrades...
Page 55: ...4 System BIOS...
Page 74: ...4 System BIOS 60 window are non configurable...
Page 79: ...5 System troubleshooting...
Page 82: ...5 System troubleshooting 68 e g two add in boards sharing the same interrupt...
Page 88: ...5 System troubleshooting 74...
Page 89: ...Appendix A Server management tools...
Page 93: ...Appendix B LSI RAID configuration...
Page 96: ...Appendix B LSI RAID configuration 82...
Page 99: ...85 U USB ports front 2 rear 4 troubleshooting 72 user password 56...
Page 100: ...86...