MDE-4813D CFN PLUS Installation Manual · February 2018
33
0
S
S
E
E
C
C
T
T
I
I
O
O
N
N
3
3
C
C
F
F
N
N
P
P
L
L
U
U
S
S
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
P
P
R
R
O
O
C
C
E
E
D
D
U
U
R
R
E
E
S
S
3
3
-
-
1
1
.
.
G
G
E
E
N
N
E
E
R
R
A
A
L
L
This section provides the installation procedures for the CFN PLUS.
These procedures include:
•
CFN PLUS installation
•
Wiring
•
Post installation check
3
3
-
-
2
2
.
.
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
S
S
P
P
E
E
C
C
I
I
F
F
I
I
C
C
A
A
T
T
I
I
O
O
N
N
S
S
3-2.1. General
N
N
O
O
T
T
E
E
Perform a site survey of the station prior to
installation
Installation procedures and requirements depend, to some extent, on the specific fuel dispenser
models and the site layout. Therefore, use the information in this section to develop installation
plans for each specific installation. Since installation requirements vary widely from case to case,
no installation hardware is supplied by the equipment manufacturer, and installation planners must
develop their own requirements.
The customer should provide an installation plan, designed by an authorized engineer, and
applicable to all authorities having jurisdiction. This plan design should reflect the existing electric
infrastructure of the site.
3-2.2. Precautions and Safety Notes
Prior to actual installation activities, carefully observe the precautions and safety notes detailed in
paragraph 2-2.2 and at the opening pages.
3-2.3. Safety Distances
shows the safety distances required for the installation of the CFN PLUS adjacent to
the dispensers. CFN PLUS will be installed in a nonhazardous location. When mounting the
CFN PLUS, a minimum clearance of 18 inches between the unit and any of the pumps or the
dispensers must be maintained. This clearance allows room for the wiring and maintenance of
the system.