20
21
EN
EN
Assembly instructions for fitters /
Load balancing for individual chargers
Assembly instructions for fitters /
Setting the amperage for main fuses
E-meter
Parttvinnad kabel
Laddbox 1
GLB
Wi-Fi
GLB
Standard
Laddbox 2
Laddbox 3
Data Link
Data Link
Data Link
Data Link
Elcentral
Energimätare
0000.0
Data Link
Kabel: ELAKY/ELAKY
-
S 2x2x0.6
eller liknande
Laddbox 4
Laddbox 5
GLB Standard
GLB Standard
GLB Standard
Adress 2
To activate load balancing, a GARO Modbus energy meter must be installed in the
supply distribution box. The following energy meters are approved:
•
GNM1D-RS485 (single-phase Modbus)
•
GNM3D-RS485 (three-phase Modbus)
The meter's Modbus address must be set to 2.
The energy meter continually measures the total energy consumption for each phase. The
data is transmitted to the wallbox, reducing the charging current in order to prevent the
main fuses from tripping. When using a single-phase wallbox, a single-phase energy
meter must be installed to the phase to which the wallbox is connected.
Load balancing for individual chargers
Example of installation
Main fuse
16A
20A
25A
32A
40A
50A
63A
SW1(1-2-3)
16A
20A
25A
32A
40A
50A
63A
SW2(1-2-3)
13A
16A
20A
25A
32A
32A
32A
During installation, the amperage of the DIP switch SW1(1-2-3) must be adjusted to
correspond with the size and strength of the main fuses.
The DIP switch SW2(1-2-3-) which controls the charger's maximum permitted charging
current should be set to the recommended current values outlined below, when load
balancing for individual chargers is activated.
The energy meter is connected to the "E-meter" printed circuit board connection block.
If the wallbox has an internal energy meter installed, the Modbus connection of the
external meter is to be connected in parallel with the internal one.
SW1
On = Fixed cable
Off = Type 2 outlet
with locking actuator
SW2-4
Setting the amperage for main fuses
Main fuse (A) in electrical
distribution box
SW2
SW2
(figure 13)
(figure 14)