RB-7-100 Page 18
RBS Series, Dual Splash Lube Blower Oil Capacities
Approximate Sump capacity in pints or ounces
SIZE
HORIZONTAL CONFIGURATION
VERTICAL CONFIGURATION
GEARS
DRIVE
TOTAL
GEARS
DRIVE
TOTAL
15-25
0.8 PT (13 oz.)
0.6 PT (11 oz.)
1.5 PT (24 oz.)
0.4 PT (7 oz.)
0.2 PT (4 oz.)
0.6 PT (11 oz.)
35-45-46
1.5 PT (25 oz.)
0.8 PT (13.5 oz.)
2.4 PT (38 oz.)
0.9 PT (15 oz.)
0.5 PT (8 oz.)
1.4 PT (24 oz.)
55-65-66
2.5 PT (40 oz.)
1.2 PT (20 oz.)
3.7 PT (60 oz.)
1.2 PT (20 oz.)
0.6 PT (10 oz.)
1.8 PT (30 oz.)
75-85-86
4.2 PT (67 oz.)
1.8 PT (30 oz.)
6 PT (97 oz.)
1.8 PT (30 oz.)
0.8 PT (13 oz.)
2.7 PT (44 oz.)
95-105-106
7.3 PT (117 oz.)
3.3 PT (53 oz.)
10.7 PT (171 oz.)
3.3 PT (53 oz.)
1.6 PT (27 oz.)
5 PT (81 oz.)
115-125-126
10 PT (161 oz.)
5.8 PT (94 oz.)
15.9 PT (255 oz.)
6.5 PT (104 oz.)
3.7 PT (60 oz.)
10 PT (165 oz.)
135-145-155
22 PT (352 oz.)
12.6 PT (202 oz.)
34.6 PT (554 oz.)
12.6 PT (202 oz.)
7.3 PT (118 oz.)
20 PT (319 oz.)
165-175
37 PT (604 oz.)
21 PT (336 oz.)
58.8 PT (941 oz.)
-
-
-
205-225
63 PT (1008 oz.)
33 PT (538 oz.)
96.6 PT (1546 oz.)
-
-
-
Note: Quantities are for purchase estimates only.
FIGURE 3-2
– APPROXIMATE OIL CAPACITIES
GEAR END LUBRICATION ( Dual Splash Lube Blowers)
At the gear end, the timing gear teeth are lubricated by being partially submerged in oil. The gear teeth serve as
oil slingers for gear end bearings.
Approximate oil sump capacities are listed in Figure 3-2.
Do not overfill as this will tend to cause excessive heating of the gears and may damage the
unit.
NOTICE
Machines are shipped without oil in the sump. Do not operate before adding lubricant.
LUBRICATION INSTRUCTIONS
Filling procedure Refer
to FIGURE 3-1. Remove the breather (B) from the gear cover. Add oil to the gear case
until oil reaches the center of the oil level gauge (C). Secure breather (B) in the gear cover.
Add fresh oil as required to maintain proper level. The oil level should be at the middle of the sight glass when
the machine is not operating. Refer to Figure 3-2.for approximate oil capacities.
Summary of Contents for RBS 15
Page 2: ......
Page 16: ...RB 7 100 Page 15 RBS OVERHUNG LOAD...
Page 26: ...RB 7 100 Page 25 SECTION 5 MAINTENANCE FIGURE 5 1 MAINTENANCE CHECK LIST...
Page 29: ...RB 7 100 Page 28 SECTION 7 PARTS LIST 7 1 RBS 15 25 Sectional drawing FIGURE 7 1...
Page 31: ...RB 7 100 Page 30 7 2 RBS 35 106 Sectional drawing FIGURE 7 2...
Page 34: ...RB 7 100 Page 33 7 3 RBS 115 225 Sectional drawing FIGURE 7 3...
Page 37: ...RB 7 100 Page 36 OVERHAUL KIT...
Page 38: ...RB 7 100 Page 37...
Page 39: ...RB 7 100 Page 38...
Page 41: ......