RB-7-100 Page 7
INDEX
Air filters and filter silencers .................................... 16
Blower startup checklist .......................................... 23
Disassembly instructions, section 6 ........................ 26
Disassembly instructions ........................................ 26
Drive end lubrication ......................................... 17, 18
Drive installation ..................................................... 12
Equipment check, section 1
Equipment check ...................................................... 9
Equipment check, section 1 ...................................... 9
Foundations ............................................................ 11
Gear end lubrication ............................................... 18
Installation, section 2
Installaion ................................................................ 11
Installation, section 2 .............................................. 11
Introduction ............................................................... 8
Limitations ............................................................... 22
Location .................................................................. 11
Lubricataion, section 3 ............................................ 17
Lubrication, section 3
Lubrication ............................................................. 17
Mounting configurations ......................................... 11
Operation, section 4
Operation ............................................................... 22
Operation, section 4 ............................................... 22
Parts list, section 8 ................................................. 28
Piping ..................................................................... 13
Recommended lubricant ........................................ 20
Removing protective materials .................................9
Repositioning the mounting feet ............................ 11
Safety precautions ....................................................5
Safety precautions ................................................. 24
Maintenance section 5 ........................................... 25
Maintenance .......................................................... 25
Storage .....................................................................9
Trouble shooting .................................................... 24
LIST OF ILLUSTRATIONS
FIGURE 2-1
– BLOWER MOUNTING CONFIGURATION ......................................................................................................... 12
FIGURE 2-2
– BELT DRIVE OVERHUNG LOAD CALCULATIONS .......................................................................................... 14
– MAXIMUM / MINIMUM OPERATING LIMITATIONS…………………………………………………………. .......... 21
FIGURE 5-1
– MAINTENANCE CHECK LIST ........................................................................................................................... 25
FIGURE 7-1
– RBS 15-225 SECTIONAL DRAWINGS .............................................................................................................. 28
FIGURE 7-2
– RBS 35-106 SECTIONAL DRAWINGS .............................................................................................................. 30
FIGURE 7-3
– RBS 115-225 SECTIONAL DRAWINGS ............................................................................................................ 33
Summary of Contents for RBS 15
Page 2: ......
Page 16: ...RB 7 100 Page 15 RBS OVERHUNG LOAD...
Page 26: ...RB 7 100 Page 25 SECTION 5 MAINTENANCE FIGURE 5 1 MAINTENANCE CHECK LIST...
Page 29: ...RB 7 100 Page 28 SECTION 7 PARTS LIST 7 1 RBS 15 25 Sectional drawing FIGURE 7 1...
Page 31: ...RB 7 100 Page 30 7 2 RBS 35 106 Sectional drawing FIGURE 7 2...
Page 34: ...RB 7 100 Page 33 7 3 RBS 115 225 Sectional drawing FIGURE 7 3...
Page 37: ...RB 7 100 Page 36 OVERHAUL KIT...
Page 38: ...RB 7 100 Page 37...
Page 39: ...RB 7 100 Page 38...
Page 41: ......