RB-7-100 Page 12
FIGURE 2-1
– BLOWER MOUNTING CONFIGURATIONS
4. Secure the mounting feet capscrews to the torque value in Figure 7-9.
NOTICE
When changing mounting configuration, it may be necessary to reposition breather/oil fill (B), oil
level gauge (H) and drain plug (A). Refer to Figure 3-1, for correct location.
DRIVE INSTALLATION
When selecting a V-belt drive, check to be sure the shaft overhung load limitation is not exceeded. Refer to
, for overhung load calculations and limitations.
Belt drives must be carefully aligned. Motor and blower pulleys must be parallel to each other and in the same
plane within 1/32 inch. Belt tension should be carefully adjusted to the belt manufacturer’s recommendation using
a belt tension gauge. Check tension frequently during the first day of operation.
Over tightening belts leads to heavy bearing loads and premature failure.
On the direct connected units, alignment and lubrication of couplings to specifications of the coupling
manufacturer is very important. When mounted drives are supplied from the factory proper alignment has been
established before shipment. However, during shipping, handling and installation, it is likely that the alignment
has been disturbed and final adjustment must be made before startup.
Summary of Contents for RBS 15
Page 2: ......
Page 16: ...RB 7 100 Page 15 RBS OVERHUNG LOAD...
Page 26: ...RB 7 100 Page 25 SECTION 5 MAINTENANCE FIGURE 5 1 MAINTENANCE CHECK LIST...
Page 29: ...RB 7 100 Page 28 SECTION 7 PARTS LIST 7 1 RBS 15 25 Sectional drawing FIGURE 7 1...
Page 31: ...RB 7 100 Page 30 7 2 RBS 35 106 Sectional drawing FIGURE 7 2...
Page 34: ...RB 7 100 Page 33 7 3 RBS 115 225 Sectional drawing FIGURE 7 3...
Page 37: ...RB 7 100 Page 36 OVERHAUL KIT...
Page 38: ...RB 7 100 Page 37...
Page 39: ...RB 7 100 Page 38...
Page 41: ......