Centric 3x480 Vac, Installation Guide, rel. 2.2
9
4.2
Installation Checklist
Complete the following checklist as you perform the installation, initialization, configuration, and testing
procedures. Refer to the appropriate sections (specified in the
Reference
column) for detailed information
about each checklist item.
When the checklist is complete, fax it to your vendor, or to Gamatronic at +972-2-582-8875.
I
NSTALLATION
C
HECKLIST FOR THE
C
ENTRIC
3
X
480
V
AC
UPS.
Customer
Address
Site
Phone
Serial numbers:
System _________________Static Switch ____________________
Modules 1___________ 2___________ 3___________ 4___________5___________
6___________ 7___________ 8___________
Technician Name
Date
Signature
√
Operation
Requirement
Reference
V i s u a l I n s p e c t i o n
Verify the physical integrity of the system
No physical damage
4.3.1
Comments on visual inspection: __________________________________________________
_______________________________________________________________________________
_______________________________________________________________________________
S i t e P r e p a r a t i o n – P h y s i c a l
Check ambient temperature.
Recommended:
betw. +15 °C and +25 °C
(+59 °F and +77 ° F)
Min/max: –10 °C and +40 °C
(+14 °F and +104 °F)
4.3.2 Step 1
Check humidity and condensation.
No condensation/dampness.
4.3.2 Step 2
Check ventilation.
Proper airflow to batteries.
4.3.2 Step 3
Check foundation and access.
Adequate structure and access.
4.3.2 Step 4
Check for adequate clearances.
See Table 3 and Figure 8.
4.3.2 Step 5
Comments on site preparation
–
physical: __________________________________________
_______________________________________________________________________________
_______________________________________________________________________________