Manual de Servicio
18/46
Issue 3.1
Ref. NR-00019-ENG
http://www.gamapur.com/
WARNING!
In order to avoid product contamination, make sure that the tanks are well closed.
Do not fill the tank to maximum capacity; check the level on the tank to make sure that
20% of its maximum capacity is vacant. Each tank is 30 liters.
Small vessels (10-15 liters maximum) are recommended to pour the product inside the
tanks.
Fill the tanks with the amount of product required for each application.
Before using the unit, the retained air and the residual oil from
the operating tests made in the factory must be eliminated. To
purge the whole circuit, proceed as follows:
a) Remove the recirculation hoses and place them in two
separate vessels to gather up the products contained
inside the machine.
b) Open the manual valves at the bottom of the tanks.
c) Open the manual recirculation valves.
d) Turn the
“RETRACT” valve as it appears (in vertical
position
it’s opened).
e) Turn the general switch
“ON”.
f) Turn the air pressure regulators anti-clockwise until the
end.
g) Push the
“START” green button. The temperature
regulator displays will light on, (whenever the switch of
the heaters is in “On“). Check the product pumps begin
to move slowly.
If necessary, increase the pneumatic pressure by
turning the regulator clockwise until the product pumps
begin to move slowly.
h) Allow the materials to come out of the recirculation hose
until the residual oil and the air bubbling has disappeared
completely.
i) Close the product recirculation valves.
j) Clean the recirculation hoses and place them to their
tanks again.
k) Slowly increase the pneumatic pressure to check for
product leaks in the hose connections.
l) Close the
“RETRATC” valve (horizontal position).
m) Turn the general switch
“OFF”. The temperature
regulator displays will go out. The machine is ready.