background image

Service Manual 

 

 

25/46 

Issue 3.1  

Ref. NR-00019-ENG 

http://www.gamapur.com/

 

 

 

CAUTION!

  Use  suitable  protection  and  follow  the  recommendations  in  the  safety 

information provided by product suppliers when installing or working with the unit. 

NOTE:

  To  ensure  that  the  unit  works  correctly,  the  electrical  supply  must  meet  the 

specifications  indicated  on  page  six  of  this  manual  and  appearing  on  the  machine 
specifications plate. 

Follow the recommended procedure in the indicated order to install the unit: 

a)  Fill the Isocyanate pump lubricating cup with DOTP plasticizer. 

b)  Connect  the  hoses  of  the  products  to  the  outlets  of  the  respective  heaters  (the 

Isocyanate hose to the Isocyanate heater and the Polyol hose to the Polyol heater). 

NOTE:

 The product hoses have been identified with red (Isocyanate) and blue (Polyol), 

enabling  them  to  be  rapidly  distinguished.    To  avoid  errors  in  connecting  the  coupling 
connectors  of  the  Isocyanate  and  Polyol  hoses, the  connectors  are  of  different  sizes  to 
make it impossible for connections to be swapped. 

The  hoses  receive  vacuum  drying  treatment  and  are  supplied  interconnected  at  the  ends  to 
prevent  them  from  absorbing  moisture.    Do  not  separate  them  until  they  are  going  to  be 
installed in the unit. 

The  hose  connection  system  includes  special  terminals  (fast  lock)  to  facilitate  the  electrical 
connection to the transformer and between the different sections installed in the unit. 

The  transformer  offers  the  option  of  connecting  to  a  40  V  output  voltage  valid  for  a  total  hose 
length of up to 48 meters. 

c) 

Connect  the  heated  hoses  wires  to  the  “fast 

lock”  connector  coming  out  of  the  hose 
transformers as follow: 

a.  Unscrew the Nylon Safety Plug from the 

“fast lock” connector body. 

b.  Unscrew  partially  the  Socket  Head  Set 

Screw from electrical wires. 

c.  Insert  the  heated  hose  electrical  wire 

with  terminals  into 

the  “fast  lock” 

connector body. 

d.  Tighten  the  Socket  Head  Set  Screw  of 

the  terminals  and  place  the  Nylon 
Safety Plugs 

Repeat  the  same  steps  to  connect  the  “fast  lock”  that 
you will find in the middle hose connections. 

d)  Connect the rest of the product hoses to complete the required length.  Remember that 

the hoses are identified with red (Isocyanate) and blue (Polyol). 

WARNING!

  To  join  the  hoses  together  or  to  connect  them  to  the  heaters  or  the  gun, 

use  two  spanners  to  hold  the  parts  to  be  joined  (1)  and  a  third  spanner  to  tighten  or 
loosen  the  connecting  nut  (2)  as  shown  in  the  illustrations  in  Figure  3  
on  page  16.  The 
connections must be tightened to a torque of 20 Nm. 

INSTALATION (HEATED HOSES UNIT)  

Summary of Contents for Easy Spray

Page 1: ...ad all the technical and safety documentation included in this manual carefully Pay special attention to the information to know and understand the operation and the conditions of use of the unit All...

Page 2: ...of heating devices pumping equipment dispensers or other parts or accessories with the Product that have not been approved or manufactured by HI TECH Failure to follow the operating instructions and r...

Page 3: ...information to alert on a situation that might cause serious injuries if the instructions are not followed CAUTION establishes information that indicates how to avoid damage to the unit or how to avoi...

Page 4: ...th the waste caused according to current regulations Disconnect the unit from the power supply before carrying out any operation inside the electrical console The electrical maintenance of the machine...

Page 5: ...ts which give the unit a total power of 1800 W and the necessary control and safety components for the precise operation of the system Its peculiar configuration allows a temperature differential T of...

Page 6: ...g System OPTIONAL Designed with a 2000 W isolation transformer that enables effective heating up to a total hose length of 48 meters 165 feet The system includes an innovative hose heating concept in...

Page 7: ...nical Maximum Working Pressure air supply 9 bar ________________ 100 bar 10 MPa 1450 psi Maximum Production Ratio 1 1 ___________________________________4 kg min 8 8 lb min Minimum Production ________...

Page 8: ...hanical Maximum Working Pressure air supply 9 bar ________________ 200 bar 20 MPa 2900 psi Maximum Production Ratio 1 1 ___________________________________4 kg min 8 8 lb min Minimum Production ______...

Page 9: ...Service Manual 9 46 Issue 3 1 Ref NR 00019 ENG http www gamapur com Figure 1 General Description Easy Spray GENERAL DESCRIPTION...

Page 10: ...lectric power desired for heating the hoses 12 Isocyanate Pressure Gage Indicates the pressure in the Isocyanate circuit 13 Polyol Pressure Manometer Indicates the pressure in the Polyol circuit 14 Is...

Page 11: ...Turns the electric supply to the control panel on and off It must be turned ON for any operation to be performed with the unit 2 Start Button This pushbutton turns the circuit control on 3 ISO POL Tem...

Page 12: ...d application temperature 30 A 38 C 100 F 35 A 48 C 118 F 40 A 60 C 140 F 45 A 75 C 167 F 50 A 80 C 176 F Turn the potentiometer clockwise until the screen shows the required amps for a quick pre heat...

Page 13: ...ate temperature regulators Instructions When the power is connected to the machine the displays will show the current temperature values To modify the values press or as required For more details abou...

Page 14: ...Manual de Servicio 14 46 Issue 3 1 Ref NR 00019 ENG http www gamapur com...

Page 15: ...Service Manual 15 46 Issue 3 1 Ref NR 00019 ENG http www gamapur com NB The temperature regulators are not inter changeable with those attached to previous versions of the machine...

Page 16: ...Polyol hose to the Polyol heater c Connect the recirculation hose of each product to the recirculation valves located in the ISO or POLY tank the Isocyanate hose to the Isocyanate tank valve and the s...

Page 17: ...gh the hose insulation so that the bottom of the thermometer is in contact with the hoses and the top is outside the insulation Fit the thermometer in such a way that the operators can see the tempera...

Page 18: ...he bottom of the tanks c Open the manual recirculation valves d Turn the RETRACT valve as it appears in vertical position it s opened e Turn the general switch ON f Turn the air pressure regulators an...

Page 19: ...e made of a plastic material which resists up to 80 C Product temperature inside the tanks must never reach that limit CAUTION Do not recirculate with full tanks since over pressure may occur in the i...

Page 20: ...the Isocyanate proportioning pump is in the retract position and the pressure begins to fall CAUTION To avoid possible product leakage and early failure of the pump seals the pressure must not be red...

Page 21: ...tor clockwise until the product pumps begin to move slowly h Allow the materials to come out of the recirculation hose until the tanks are completely empty i Turn the general switch OFF The temperatur...

Page 22: ...t will light on Check the product pumps begin to move slowly If necessary increase the pneumatic pressure by turning the regulator clockwise until the product pumps begin to move slowly ff Allow the D...

Page 23: ...ome out of the recirculation hose until the tanks are completely empty h Turn the general switch OFF The temperature regulator displays will then go out i Close the product manual valves at the bottom...

Page 24: ...reen button The temperature regulator displays will light on whenever the switch of the heaters is in On Check that the product pumps move dd Turn the general switch OFF The temperature regulator disp...

Page 25: ...parate them until they are going to be installed in the unit The hose connection system includes special terminals fast lock to facilitate the electrical connection to the transformer and between the...

Page 26: ...k of the gun making sure that the manual valves are closed g Insert a contact thermometer through the hose insulation so that the bottom of the thermometer is in contact with the hoses and the top is...

Page 27: ...e the whole circuit proceed as follows a Keep the coupling block with the outlet of each product in separate vessels and open the manual valves of each product b Turn the pneumatic pressure regulator...

Page 28: ...er anti clockwise until the screen shows 25amps To avoid excessive pressure in the heated hoses wait for the product in them to reach the required temperature before starting up the air motor system f...

Page 29: ...ng pump is in the retract position and the pressure begins to fall CAUTION To avoid possible product leakage and the early failure of the pump seals the pressure must not be reduced to zero It is reco...

Page 30: ...f the coupling block until the tanks are empty i Close the manual valves on the coupling block j Turn the general switch OFF The temperature regulator will go out k Close the manual valves at the bott...

Page 31: ...ing agent the cleaning process is complete and you can proceed as normal aa Close the RETRATC valve horizontal position bb Turn the general switch OFF The temperature regulator displays will go out cc...

Page 32: ...he heaters is in On Check the product pumps begin to slowly move If necessary increase the pneumatic pressure by turning the regulator clockwise i Allow the materials to come out of the coupling block...

Page 33: ...n the process carefully read the safety information provided by your supplier Deal with the waste caused according to current regulations Disconnect the unit from the power supply before carrying out...

Page 34: ...by deactivating the POWER CONTROL The thermostat will not reset until the temperature in the heater is below 120 C 248 F 1 Heating Elements Each heater includes two 900 W heating elements connected i...

Page 35: ...2000 230 26 2 13 2 6 2 4 2 2000 400 80 2 40 2 20 2 13 2 2000 440 96 2 48 2 24 2 16 2 Under extreme environmental conditions the heater might be affected and fail to reach the required temperature In t...

Page 36: ...g capacity less effective Under extreme environmental conditions the hose heating system may be affected and fail to reach the required temperature 2 Hose Transformer The transformer offers the option...

Page 37: ...mediately before b Restore the power supply press the POWER CONTROL key and the key under the HOSES display If the heating works the problem will be in the last section of hose Replace it If not do th...

Page 38: ...nding direction check the discharge ball valve upper valve if pressure is lost in a descending direction check the aspiration ball valve lower valve Proceed as follows to check the ball checks a Disco...

Page 39: ...emperatures the product increases in viscosity making the pumping more difficult When the ambient conditions prevent the products from being maintained at a minimum temperature of 12 C auxiliary heati...

Page 40: ...ectrician To avoid damage caused by the impact of pressurized fluids do not open any connection or perform maintenance work on components subject to pressure until the pressures have been completely e...

Page 41: ...alue of the resistance must be as shown in Table 1 on pag 35 d Apply Teflon or sealing paste to the thread and screw the element into its housing e Reconnect the wires to the connection block make sur...

Page 42: ...e of the new components please refer to table 20 in the Parts Manual NR 00018 for p n of the different models and sizes Also inspect the lower and upper ball and the seat assembly looking for wear hit...

Page 43: ...absorption of moisture and the possibility of contamination through the reaction with the solvent used in the cleaning operation To check the product inlet filters proceed as follows a Disconnect the...

Page 44: ...ration If the gaskets and the seals are in a good state the plasticizing oil will not have to be changed so frequently To replace the plasticizing oil of the pump proceed as follows a Use the gun to p...

Page 45: ...Installation Recirculation Unit _________________________________ 16 Start Up Procedures __________________________________________ 19 Daily Shutdown ______________________________________________ 20...

Page 46: ...G http www gamapur com Figure 1 General Description Easy Spray __________________________ 9 Figure 2 Control Panel and Hose Heating_________________________ 11 Figure 3 Method of union of the Hoses __...