Annual Maintenance Procedure
−
Every 12 months the thermostatic mixer must be inspected & tested. The valve should be inspected for
leaks or water damage and appropriate action taken if required.
−
Carry out the general servicing of the valve as set out in this document
−
A thermal shut down test is performed (Shut Down Test 1 and 2 as set out in this document), and the
temperature is reset as required.
−
If the valve fails to shut down or fails to maintain its set temperature, then refer to Troubleshooting
section.
5 Year Maintenance Procedure
−
Every five years the thermostatic mixer needs to have a full service carried out. This service consists of
the s me pr edure s the ‘ nnu nten n e Pr edure’ sted p us the therm st t m xer rtr dge
must be replaced.
−
After replacing the thermostatic mixer cartridge, a thermal shut down test is performed, and the
temperature re-set as required. If the valve fails to shut down or fails to maintain its set temperature, then
refer to the troubleshooting section.
−
Once the 5 yearly maintenance procedure is complete, the thermostatic mixer should then be
commissioned as per instructions.