Revision 5
25
August 2021
Figure 5: Oven Enclosure Tubing Removed
3. Insert the probe into the packing gland at the bottom of the oven indicated in Figure 6
until it reaches the steam jacketed ball valve.
Figure 6: Inserting the Sample Probe
4. Open the steam jacketed ball valve and continue inserting the probe until the probe
flange contacts the packing gland.
Tubing removed
Packing gland
Sample probe
Summary of Contents for 943-TGXeNA
Page 130: ...Revision 5 130 August 2021 Figure 82 Oven Cabinet Door Removed ...
Page 131: ...Revision 5 131 August 2021 Figure 83 Control Cabinet Door Removed ...
Page 132: ...Revision 5 132 August 2021 Figure 84 Power Steam Air Signals Connection Details ...
Page 133: ...Revision 5 133 August 2021 Figure 85 AC Wiring Schematic ...
Page 134: ...Revision 5 134 August 2021 Figure 86 DC Signals and Wiring Diagram ...
Page 135: ...Revision 5 135 August 2021 Figure 87 Flow Diagram ...