Revision 5
128
August 2021
8.3
QA Document Package Check List and Requirements
Table 34 is completed during the manufacturing process and QA inspection to ensure that the
all relevant operations are performed.
Table 34: Document Package Checklist
Serial Number: _______________
Description
Initial
Date
Sample System Pressure Checked - System Heaters
Sample System Pressure Checked – Sample System
Purge System Checked
Aspirator Performance Tested
Gas Runs Complete (Calibration Data Sheet)
Temperature Sensor Inputs Checked and Calibrated
Analog Output Calibration Checked
Digital Output Checked
System 24VDC Supply Checked
Span Factor Set
Condenser Solenoid Function Checked
Zero Solenoid Function Checked
Control Cabinet Air Solenoid Function Checked
Operation of Cell Heaters Checked
Burn Oven for three (3) weeks
Cell Pressure Transducer Checked.
Dielectric Strength Test Certificate Completed
Matrix and Cal Documents Completed
Serial Numbers Recorded
Oven Lid Latches Adjusted and Locked
Summary of Contents for 943-TGXeNA
Page 130: ...Revision 5 130 August 2021 Figure 82 Oven Cabinet Door Removed ...
Page 131: ...Revision 5 131 August 2021 Figure 83 Control Cabinet Door Removed ...
Page 132: ...Revision 5 132 August 2021 Figure 84 Power Steam Air Signals Connection Details ...
Page 133: ...Revision 5 133 August 2021 Figure 85 AC Wiring Schematic ...
Page 134: ...Revision 5 134 August 2021 Figure 86 DC Signals and Wiring Diagram ...
Page 135: ...Revision 5 135 August 2021 Figure 87 Flow Diagram ...