Revision 4
78
August 02, 2019
Figure 7-2: Location of On/Off Switch
c) Access the purged control cabinet following proper company and/or regulatory agency
procedures.
d) Lift the fuse terminal tab opening the terminal block and disconnect the UV Lamp Power
Supply fuse. (ACTS:28) or place the UV Lamp power switch to the Off position (see
Figure 7-2 for the location of the switch).
e) Remove the UV Lamp Power Supply cabinet lid by removing the four (4) s and pulling the
cabinet lid towards you.
f) Remove the two (2) plastic hole plugs from the top of the UV Lamp Power Supply to gain
access to the lamp retaining screws.
g) Disconnect the three (3) lamp connection wires from the terminal strip.
Socket Head Cap Screw
Summary of Contents for 943-TGX
Page 48: ...Revision 4 48 August 02 2019 Figure 4 13 Network Sub Panel...
Page 94: ...Revision 4 94 August 02 2019 Figure 9 3 Control Cabinet Detail...
Page 96: ...Revision 4 96 August 02 2019 Figure 9 5 AC Wiring Diagram...
Page 97: ...Revision 4 97 August 02 2019 Figure 9 6 DC Signal and Wiring Diagram...
Page 98: ...Revision 4 98 August 02 2019 This Page Intentionally Blank...