.
SAFETY
SAFETY MACHINE OPERATION
PARKING MACHINE
Park the machine on firm, level ground.
Select a place where there is no hazard of falling rocks or
landslides, or of flooding if the land is low.
Lower the work equipment completely to the ground.
When leaving the machine, set lock lever (1) to the LOCK
position, then stop the engine.
Always close the operator's cab door, and use the key to lock all
the equipment in order to prevent any unauthorized person from
moving the machine. Always remove the key, take it with you,
and leave it in the specified place.
If it is necessary to park the machine on a slope, always do as
follows.
Set the bucket on the downhill side, then dig it into the
ground.
Put blocks under the tracks to prevent the machine from
moving.
2 - 28
Summary of Contents for PC78MR-6
Page 2: ... 1 1 ...
Page 4: ... FOREWORD FOREWORD 1 3 ...
Page 5: ... FOREWORD FOREWORD 1 4 ...
Page 15: ... ...
Page 16: ... 2 1 ...
Page 20: ... SAFETY SAFETY LABELS LOCATION OF SAFETY LABELS 2 5 ...
Page 55: ... ...
Page 56: ... 3 1 ...
Page 195: ... ...
Page 196: ... 4 1 ...
Page 271: ... ...
Page 272: ... 5 1 ...
Page 275: ... ...
Page 276: ... 6 1 ...
Page 294: ... ...