.
MAINTENANCE
MAINTENANCE PROCEDURE
EVERY 100 HOURS MAINTENANCE
Maintenance for every 50 hours service should be carried out at the same time.
LUBRICATING
NOTICE
If any abnormal noise is generated from any greasing point, carry out greasing regardless of the greasing interval.
Carry out greasing every 10 hours for the first 50 hours on a new machine.
After the machine was subjected to jobs in the water, be sure to grease the wet pins.
Prepare a grease gun
1. Set the machine to the greasing posture shown on the right
diagram, lower the work equipment to the ground, then stop
the engine.
2. Using a grease pump, pump in grease through the grease
fittings shown by arrows.
3. After greasing, wipe off any old grease that was pushed out.
(1) Arm-Bucket coupling pin (1 place)
4 - 52
Summary of Contents for PC78MR-6
Page 2: ... 1 1 ...
Page 4: ... FOREWORD FOREWORD 1 3 ...
Page 5: ... FOREWORD FOREWORD 1 4 ...
Page 15: ... ...
Page 16: ... 2 1 ...
Page 20: ... SAFETY SAFETY LABELS LOCATION OF SAFETY LABELS 2 5 ...
Page 55: ... ...
Page 56: ... 3 1 ...
Page 195: ... ...
Page 196: ... 4 1 ...
Page 271: ... ...
Page 272: ... 5 1 ...
Page 275: ... ...
Page 276: ... 6 1 ...
Page 294: ... ...