11
1
When the pipe work and electrical connections have been completed the front cover can then be prepared to be fitted prior
to beginning the commissioning procedure.
2
Where a top or bottom entry supply configuration has been used, remove the relevant pipe work
and cable entry point from the required section of the front cover, using a suitable tool.
We recommend making good the cut out section using a round file. Ensure the front cover fits
over the cables and pipes correctly. Ensure that only designated areas are cut.
1
The shower head should be sited close to the shower unit, not necessary on the same wall, but so that the unit is not
subjected to continuous spray. The shower head should be sited so that it is no more than 610mm (2ft) above the bottom
of the unit or no lower than 305mm (1ft) below the unit, when in its normal position in the shower head holder. Please see
separate installation instructions supplied with the accessory kit for installation of handset, hose, rail and pillar pack.
Earth bonding
!
The installation must be earth bonded in accordance with current regulations
Where earth bonding of the premises is not evident, it may be necessary to run a bonding cable back to the earth
terminal at the consumer unit.
Shower head installation
!
THE SHOWER OUTLET, HOSE AND HANDSET ACT AS A VENT, THEY MUST NOT BE BLOCKED, OBSTRUCTED OR HAVE
CONNECTED TO THEM ANY FITTING INCLUDING HOSE OR HANDSET NOT APPROVED BY US. THE USE OF UNAPPROVED
ACCESSORIES MAY INVALIDATE THE GUARANTEE AND MAY AFFECT THE PERFORMANCE AND SAFETY OF THE UNIT.
Front cover preparation
Front cover installation and shower commissioning
!
Before use this shower must be fully commissioned following the procedure detailed overleaf. Failure to do so could
damage the shower and invalidate the guarantee.