6
1
Carefully remove the badge and loosen the
fixing screw. Carefully lift the casing up and
away from the engine assembly.
2
Tape the template provided onto the finished wall surface in the desired position and mark the three fixing points. Drill
and prepare the fixing holes using appropriate fixings (not provided).
!
In addition to the guide that follows it is essential that the written instructions on pages 4 and 5 are read and understood,
and that you have all the necessary components before commencing installation. Failure to install the product in
accordance with these instructions may adversely affect the warranty terms and conditions. Do not undertake any part of
this installation unless you are qualified to do so. Prior to starting, ensure you are familiar with the necessary plumbing and
electrical regulations and legislation required to install the product correctly and safely.
Gainsborough reserves the right to revoke the terms of the warranty should access to the service connections be denied by
the use of solid setting infill material.
Pipework Installation instructions
3
Once all pipe work has been completed flush through the water supply
allowing it to discharge safely to waste, before fitting the unit.
Some modern fluxes can be extremely corrosive and, if left in contact will
attack the working parts of this unit. All soldering must be completed and
pipe work thoroughly flushed out in accordance with current Water Supply
Regulations prior to connection of the product
Pipe work connections are made using a 15mm push fit connector. Remove appropriately the inlet
bung as shown below. Please ensure pipes for rear entry are 18mm from the finished wall surface
and 70mm long.
!
To remove the inlet bung depress the collet using your finger or a suitable tool such as a 15mm
open ended spanner. Then apply a firm pressure to pull the bung out whilst keeping the collet
depressed.
18mm
7
0
Compression
18mm
70
M
in
im
um
Soldier ring & end lead