GABRIEL KERAMIK AB
ROUND • 11
963 mm
12
9
min.
500
953 mm
8A
14
7
Ø 630 mm
Ø 680 mm
12
13
14
Assembly
Cut the two insulation strips and set
the top of the firebox block (9) with
mortar.
Set the fourh firebox block (8A)
on top of the third one.
Make sure that no mortar falls
between the firebox block and the
outer block.
Make sure that no mortar
falls between the firebox
block and the outer block.
Set the outer block (7) in mortar.
Before continuing above
the firebox opening,
construct a prop to sup-
port both
the outer
block and
the firebox
top block as
shown in
the picture.
The support
will also be
of help when
tiling above
the firebox. Keep the sup-
port in position till the next
day or even longer.