GABRIEL KERAMIK AB
ROUND • 9
5
S
8
8
6
7
8
Set the outer block (5) with mortar.
Level vertically and horizontally.
Assembly
Set the firebox (8) with mortar.
The firebox block may not touch
the outer block (the firebox block
must be allowed to expand freely
without affecting the outer block).
Level vertically and horizontally.
Push the firebox block backwards
as much as possible. Place the insu-
lation and pull the firebox block
back to ”lock” the indsulation.
Make sure that no mortar
falls between the firebox
block and the outer block.
Set the second firebox block (8) on
top of the first one. Make sure that
no mortar falls between the blocks.
Level vertically and horizontally.
Make sure that no mortar
falls between the firebox
block and the outer block.