GABRIEL KERAMIK AB
10 • ROUND
9
5 0 0 m m
5
6
11
963 mm
8A
9
10
11
Assembly
Set the outer block (5) with mortar.
Level vertically and horizontally.
Check that the height is
within the tolerane (500 mm)
Set the outer block (6) with mortar.
Set the third firebox block (8A)
on top of the second one. Make
sure that no mortar falls between
the firebox block and the outer
block.
Level vertically and horizontally.
Make sure that no mortar
falls between the firebox
block and the outer block.
For a better joint, wipe the
contact surfaces with a
squeezed sponge, then
brush with a wet radiator
brush.