GABRIEL KERAMIK AB
ROUND • 21
7
8
1
3
7
5
6
4
2
8
36
37
38
Assembly - tiles
Apply the tiles intended for the soot
holes. Level vertically and horizon-
tally.
Continue the tiling around the
firebox opening and then around
the firebox.
It is important to level the
tiles vertically and horizon-
tally to be able to install the
cassette in exact position.
Check again that the tiling around
the firebox opening is vertically
and horizontally levelled. The cas-
sette must be fitted close to each
tile around the firebox opening.